[1]
A. G. Shahane, S. D. Kamble, A. A. Apake, O. A. Patil, A. D. Khade, and S. D. Deshmukh, “A Project Phase-I Report on 3 Stage Bank Locker”, IJRAMT, vol. 2, no. 7, pp. 101–103, Jul. 2021, Accessed: Nov. 22, 2024. [Online]. Available: https://journals.ijramt.com/index.php/ijramt/article/view/1013