Engineering Change Note Work Flow Management

Authors

  • K. A. Ramya Reddy Student, Department of MCA, Adhiyamaan College of Engineering, Hosur, India
  • R. Sakthidharapriya Assistant Professor, Department of MCA, Adhiyamaan College of Engineering, Hosur, India

Keywords:

Work flow management

Abstract

The project “E_C_N work Flow Management” Means Engineering Change Note Work Flow Management System. It mainly works on C#, Asp.Net, Mysql. we have to develop. First, we have to understand the requirement, and next we have to do document, and architecture. Next, we have to do coding and testing and finally have to launch the project. Time to time we have to come out with the requirements, modules, coding developed, testing and the project we have to update time to time. Here people are releasing the open points issues are released by one department remaining department will respond to thereby giving solution. Purchase team will update if there was a material procurement against each issue. Each department will use this portal for entering the status of the Engineering Change Note.

Downloads

Download data is not yet available.

Downloads

Published

28-04-2022

Issue

Section

Articles

How to Cite

[1]
K. A. R. Reddy and R. Sakthidharapriya, “Engineering Change Note Work Flow Management”, IJRAMT, vol. 3, no. 4, pp. 135–137, Apr. 2022, Accessed: Nov. 22, 2024. [Online]. Available: https://journals.ijramt.com/index.php/ijramt/article/view/1973